Tips in Achieving Optimum Economy in Performing Forensic Schedule Analysis
"The Least Cost Way to Achieve Good-Faith Compliance" by By Kenji P. Hoshino, PSP, CFCCA.
Introduction:
"The Least Cost Way to Achieve Good-Faith Compliance" by By Kenji P. Hoshino, PSP, CFCCA.
Introduction:
"The Streamlined Expert Report: Structure of Expert Report for Forensic Schedule Analysis" by
Abstract:
"Forensic Schedule Analysis TCM Framework: 6.4 – Forensic Performance Assessment" by
Acknowledgments: (April 25, 2011 Revision)
"A Defense of the AACE Recommended Practice for Forensic Schedule Analysis" by
Abstract:
"AACE Recommended Practice for Forensic Schedule Analysis" by
Abstract:
The Recommended Practice for Forensic Schedule Analysis (RP/FSA) is a technical document published by the Association for the Advancement of Cost Engineering, International (AACE).
"P6 Discovery Under the US Federal Rules of Civil Procedure" by Kelly Roger Wallace, PSP and Kenji P. Hoshino, PSP CFCC
Abstract
"Proposed Specification Language Regarding Pacing" by Mr. Kenji P. Hoshino PSP
This paper proposes contractual language intended to specify and predetermine rules for applying the pacing concept to delays that would otherwise be determined as concurrent delays.
"Surviving a Daubert Challenge: A CPM Expert’s Perspective" by Kenji P. Hoshino
This paper presents my opinions based on personal experience and research on the subject of procedural challenges to the admissibility of expert testimony, also known as Daubert challenges. The paper focuses specifically on the application of the Daubert case on opinions by forensic scheduling experts in the context of construction contract disputes. The reader should not consider the contents of this paper as legal advice.
"Collapsed As-Built: The Right Way" by Kenji P. Hoshino
The purpose of this presentation is to respond to the misguided and unwarranted criticisms of the Collapsed As-Built method and to provide as set of guidelines to correctly implement the method.
I Andrew Richard Hounslow confirm Raf Dua reported directly to myself on the Queensland NDRRA program named TNRP.
Raf has many years of expertise in Project and Program controls, the expertise is with in many different industry’s which always is a positive for thinking outside the normal. Raf is an excellent project controls team member and clearly analysis the delivery for the better of the final delivery. Raf is always methodical with his approach on all project/program lifecycles.