wbs problem -urgent

Member for

24 years 6 months

Can also update activities using Global Change i.e. SS(WBS,x,y) where x is start position including the separators and y is length.



To update the dictionary see knowledge base article 200252492644 and use Project.xls to export the WBS codes and tiles, then massage this to conform to a previously saved activity code format and then import the activity codes and titles.



Work in a copy or make sure you have good backups before you start.


Member for

23 years

There are some spreadsheets (activity.xls) provided with the P3 installation CD, which with a bit of tweaking would let you do this.





HTH




Member for

22 years 4 months

Hi John



In my view your WBS coding and defining is not correct which needs to be reviewd that’why when you organize, it does not cover the FINAL date of whole project.



Moreover send me your copy of P3 file for correcting this error.


Member for

21 years 8 months

Try organizing first by Project with totals then by WBS. In this way (organizing by activity codes) you make sure you are adding a level above all WBS codes, totals will roll up to the project level. If this works then check on your WBS structure.

Member for

21 years 2 months

Have a look at your wbs Structure I think the problem is there.



Standard P3 setting will not allow this to work correct. (10)



Data - WBS - Structure



Also remember to look at organize and total at the different levels

Member for

23 years 8 months

(Sorry for the duplicated postings since a book falls on the keyboard when I editing.)



Consider the WBS as follows: -

1. Construction of Building

1.1 Phase 1

1.2 Phase 2

1.3 External Works

Member for

23 years 8 months

According to your listed, all 4 items are in Level 1.

would you mind list the WBS value against the item for further details

Member for

23 years 8 months

According to your listed, all 4 items are in Level 1.

would you mind list the WBS value against the item for futther details

Member for

23 years 8 months

According to your listed, all 4 items are in Level 1.

would you mind list the WBS value aginst the item for futther details