I have a project that I have imported from MSP.
I have 215 activites in which within this I have 7 sites.
Is it possible to replicate each site within my activities for 6 years. (example Site 1-activities associated with each. It shows the schedule from 2012 to 2013 and I want it to show the same activities within that site for
If this is possible how would I go about doing this?
Thanks
Rhys
Sorry Gary me and explaning sometimes don't go :)
What it is I have activities that are sub headed as individual sites with activities associated with them.
What I need to do is for each sub heading and their activities is replicate this for 6 years. So at the moment its from april 2012 to april 2013 for site A and Site B and Site C etc each having activities listed for them.
I was thinking of copying the individual sub headings within the WBS six times.
Does this seem like the correct solution.
Hope that helps
Thanks
Hi Rhys,
Apologies if I'm being dense, but I have absolutely no clue what you are trying to achieve. -Could you have anothe go at explaining it?
Cheers,
G