Hi Everyone,
Our project is currently delayed by 25% from the baseline schedule. My Boss want me create a presentation in P6 comparing the baseline against current schedule and show all the logs. I tried to check the SR-12 report in P3 which matches what my Boss required, but when I check the P6 default report - SR-12 is not available.
Can anybody help or advise the steps and procedure to show the presentation required in P6.
Thanks