S-Curves: Early and Late

J
Jean-Yves Moine 👤 Member for 17 years 4 months

 

you can buy "S curves V2" VBA EXCEL application: http://www.cubixpm-scurves.com/en/

it allows to :

  • Create 26 S curves (baseline early and late, physical progress) in automatic connection with aMS PROJECT or PRIMAVERA P6 schedule.
  • Spread the weights in a linear or Gaussian way over the tasks of schedule.
  • Create S curves with 3 criteria, on the basis of 5 task codes.
  • Manage a schedule up to 10,000 tasks.

BR, Jean-Yves Moine.

S
Saule Kokeyeva 👤 Member for 15 years 5 months

Dear Comert

Could you please send to me an illustrated pdf. document regarding this issue. I am intrested in creating Early Start, Early Finish , Late Start and Late Finish curve? My e-mail address is [email protected]

Regards,

Saule

 

 

R
Rafael Davila 👤 Member for 22 years 3 months

After you figure out how to set up your S curves you shall save the template so in the future it comes out at a click of the mouse.

Remember progress reports must be compared against the baseline, otherwise they mean little. You shall have on the same graph early and late S curves for the Baseline Schedule as well as actual and projected early and late curves for current job.

As far as I recall P3 could display current versus two baselines. Perhaps showing two baselines in the same graph is too much but current and no baseline definitively is not enough.

C
Comert Vardar 👤 Member for 15 years 9 months

I replied Tarek, check your mails.

Also Mr. Rodel’s link works well about it.

Have a nice day.



Comert

C
Comert Vardar 👤 Member for 15 years 9 months

give me your mail address, i will send illustrated pdf. document about this issue.



Comert Vardar

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts