Original Duration
Forum Sponsor
Top Posters
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
Rizwan,
It depends on how you want to use your OD. The normal practice is to save a baseline. Baseline will carry the OD of the schedule and mean not to change except approved changes require changing the original baseline. During the update you may change the current original duration to show the correct schedule % complete vs. actual % complete and reflect the current status of schedule and compare to baseline at the same time.