Organizing Schedule BY Project Codes

R
Rodel Marasigan 👤 Member for 19 years 7 months

Wafa,



Project Codes sequence can be control/ arrange on Project codes itself. Select Enterprise-> Project Codes then select the codes you wanted to arrange the sequence. Click arrow up or down to arrange the sequence according to your needs. Or you can sort it alphabetically by ticking sort band alphabetically on group and sort group options.

W
wafa Hussain 👤 Member for 16 years 4 months

Thanks Rodel,

Yes we are doing for multiple projects and codes have already been assigned ...my problem starts when I try to organize I dont have control on the sequence

R
Rodel Marasigan 👤 Member for 19 years 7 months

Wafa,



Project codes are higher level assigned to projects and cannot be assigned to activity level. It can show on column and group & sort is also very useful if you are working on multiple project or enterprise level. (i.e. EPS/WBS) You might be looking for activity code instead of Project codes.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts