Organizing Schedule BY Project Codes
Forum Sponsor
Top Posters
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
Thanks a lot Rodel you are a very helpfull senior
Wafa,
Project Codes sequence can be control/ arrange on Project codes itself. Select Enterprise-> Project Codes then select the codes you wanted to arrange the sequence. Click arrow up or down to arrange the sequence according to your needs. Or you can sort it alphabetically by ticking sort band alphabetically on group and sort group options.
Thanks Rodel,
Yes we are doing for multiple projects and codes have already been assigned ...my problem starts when I try to organize I dont have control on the sequence
Wafa,
Project codes are higher level assigned to projects and cannot be assigned to activity level. It can show on column and group & sort is also very useful if you are working on multiple project or enterprise level. (i.e. EPS/WBS) You might be looking for activity code instead of Project codes.