How to change default currency for a project in group

D
Dieter Wambach 👤 Member for 19 years 5 months

Rajasekhar

We solve this item by creating all internal reports in Euro. Cost related external reports are only produced by SAP.

There is just one factor per currency and not related to time. As far as I’m informed, Primavera announced a periodical currency factor for P8 in 2010.

Regards

Dieter

R
Rajasekhar Reddy 👤 Member for 17 years 5 months

Hi Dieter Wambach,



Thank you very much for your reply. As you said calculation of currency by currency factor we may get value. But if it a MNC company and you are doing many projects at a time you may not be getting right value. because as time pass the currency convertion will change which will result in different values for different projects. so is any option/ possibulity to rectify it?

D
Dieter Wambach 👤 Member for 19 years 5 months

Rajasekhar

As far as I know it isn’t possible for a project. You can influence the currency for:

- Whole database - the base currency

- Resource

- User



As everything is memorized in the standard value and just calculated based upon the currency factors for user interface, you can easily change your user setting during a session.



Regards



Dieter

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts