For the last word on Forensic Analysis, AACEi is the place to go. They provide free Recommended Practices on-line. Try, http://www.aacei.org/technical/rps/29R-03.pdf for the RP on FOREENSIC SCHEDULE ANALYSIS, or http://www.aacei.org/technical/rps/52r-06.pdf for the RP on TIME IMPACT ANALYSIS. Why not look at everything available at http://www.aacei.org/technical/rp.shtml? Good luck!