P5 Batch Reporting

K
K D 👤 Member for 18 years 8 months

Hi.

How about filter Project ID. I can not check it whether that field is availble, cause I do not have the server here.

D
Dieter Wambach 👤 Member for 19 years 5 months

Oliver

I don’t know a way to run batch-reports against a portfolio and quite sure that no internal means can provide it.

Regards

Dieter

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts