Naveen Subbaiah 👤 Member for 21 years 5 months

Thanks for your thoughts on this Dick. There is an option while copying which allows us to carry this relationship. However this caused another problem. This particular activity in Project 2 will have two predecessors (same activity from two revisions) - one from Rev1 & another from Rev 2 of Project 1. So I am left with two options now. One, bring the relationship while copying & delete the predecessors from Rev1. Second, Reestablish the links without bringing the links from Rev2.



Thanks

Naveen

A
Andrew Dick 👤 Member for 19 years 4 months

Naveen,

I think you will need to recreate the relationships in question, as I am of the opinion that these relationships are not ’Live’ but are stored information based on the last update.



If this is the case when you copy you will indeed only copy the original peices of information.



Also, I’m not sure that both Rev 1 and Rev 2 will now be linked to the second project (I think this would be the case), therefore depending on which project has the driving relationships you may cause yourself some pain. Something to think about though.



Andy

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts