P3 importing to the P3e
Forum Sponsor
Top Posters
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
Hi Deepak,
I’m not sure which layout you’re referring to. If you are looking for the save layout in P3, the answer is save layout in P3 are not imported to P3e or P5. Once you import a P3 file P3e or P5 use the current layout used before importing P3 program files but you can always organised and change the layout same as you have in P3.
Note: P3 always have a save layout for individual project (????LAY.P3) and P5 is an enterprise version which has only one database on all projects and the default layout is the current layout when you exit P5 program. The layout is always save globally and if you are using Activity Codes on the layout which is not present on the other project then the layout will result differently. You have to save different layout for each project unless youre using global Activity Codes which have same structure on every project that you have on your PMDB database.
Regards,
Rodel