Hi All
I wish to see how much formwork decks are ín use' ie are keep in place while floors above are being constructed. What is the general rule here?
Hi All
I wish to see how much formwork decks are ín use' ie are keep in place while floors above are being constructed. What is the general rule here?
You must differntiate structure type, a post-tensioned structure is not the same as a flat slab or concrete joist slab.
http://concreteconstruction.net/Images/Reshoring%20of%20Multistory%20Co…
http://www.concrete.org/Portals/0/Files/PDF/Previews/347205_2pager.pdf
https://ardiansyahnegara.files.wordpress.com/2010/01/ch8_construction-l…
http://eprints.qut.edu.au/4051/1/4051_1.pdf