Sometimes the goal of the project is to finish the project as earliest as possible, sometimes it is to finish it with the lowest cost, sometimes it is to obtain the best Product with a high quality and design/functionalities, and sometimes it is a mix between cost, time and scope. That is why on the picture below, I call Project control the interaction between the Time, the Cost, the Product’s physico-functional characteristics with the value that the project brings. The article here: http://3d-wbs.blogspot.fr/2014/09/part-136-overall-project-structuration.html
Overall project structuration in a multidimensional way