yes Mr.Mike it is named as last planner method .
Thanks to Mr.John i searched through Google which is reflecting the message you said
Las Planner System of Production Control.
Used within Lean Construction companies to reduce variability through use of weekly meetings between the various subcontractor gangers (the last planners). They have to agree through lookaheads what work is planned, what are the blockers to cpompletion and how these can be mitigated. Also analysis on the percentage of last weeks plan complete (PPC)and reasons for failure (we used 5-why analysis). If you google Last Planner System, youll get plenty more, but I thought it a good robust system
Hi Shahul
Are you sure its not Lost Planner Method - that is quite common in the industry.
Or perhaps it refers to the Last Planner Standing after one of our debates on lead / lags.
If it really means the method used by the last planner on the job be very wary of it - he/she obviously quit before the excrement hit the air circulation device.
Best regards
Mike Testro.