EPC schedules

S
Samer Zawaydeh 👤 Member for 17 years 10 months

Dear Abhishek,



A Program of Works is prepared to make sure that the project "scope" is complete on "time and within "cost".



Your job as a planned is to prepare such a Schedule. The project type determined what activities you need to include; Sales, Estimation, Design, Detailing, Procurement, Storage, Logistics, Construction, Fabrication, Erection, Quality Control, Tre v



atment, Commissioning, and many more.



Best Regards,



Samer

D
Dieter Wambach 👤 Member for 19 years 4 months

Abhishek



You’ll have to plan and to control the relationships between the different phases - you can’t erect a turbine before its foundation is ready, you’ll have to create the requisition before order, regard arrival at site before erection, etc.

If you’ll plan with different inter-linked schedules or use one single schedule depends on project, its stakeholders (e.g. a required data exchange with a subcontractor) and the features of the software you use.

The output should be the same.



Have a happy new year!



Dieter

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts