I went to the survey site, but could not complete it as it requires experience with both types of planning/scheduling softwares. I have worked with activity based scheduling software like MS Project and Primavera but not with location based. In fact this is the first time I have come to know of Control 2008. I doubt many people will have experience using it.
Dear Karl,
The software used by most of the Construction sites is "Primavera". In order to benefit from the time that you will be spending on studying the benefits of both system, it would be a good idea to study Primavera software as well.
The result of your survey would be a statistical analysis. I recommend that you select a specific sector of your choice and ask about that field, then develop the survey accordingly.
Let us know if we can be assist more.
Good luck,
Samer