No Subject Specified

J
James Barnes 👤 Member for 18 years 9 months

double click the yellow timescale at the top of the screen. In the dialog, you will see a slide bar labelled "Density". Silding that to the right will increase you bar lengths.



For printing, however, you need to play around with the settings in print preview. In there you can set the date range that will be displayed and this will be scaled to fit the page size you have selected. It’s quite powerful but takes some time to learn the ins and outs. Play around with it and you’ll be a pro in no time!

S
Shahzad Ahmad 👤 Member for 18 years 3 months

i did that ...i set time scale ....Minimum Unit week.





..any other option is there..

K
Kamal Khemchandani 👤 Member for 18 years 6 months

Hi shahzad,



Have you tried increasing the time scale



go to format>timescale

there you can set the density for the duration by moving the slider to the right.

The bars automatically look longer



voila

regards

S
Shahzad Ahmad 👤 Member for 18 years 3 months

Slam

I have a new project base line programme.



duration is very less naturally bar length is short,



i want to increase bar length with out increasing duration to make a presentable bar chart.



if there is any way to do so..



I am using P3...



Thanks

S
Shahzad Sikandar 👤 Member for 20 years 4 months

hi Shahzad



i dont undertand your question again sorry,,



when you increase duration, the lenghth of bar should automatically increase.



in it?



cheers

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts