double click the yellow timescale at the top of the screen. In the dialog, you will see a slide bar labelled "Density". Silding that to the right will increase you bar lengths.
For printing, however, you need to play around with the settings in print preview. In there you can set the date range that will be displayed and this will be scaled to fit the page size you have selected. Its quite powerful but takes some time to learn the ins and outs. Play around with it and youll be a pro in no time!
i did that ...i set time scale ....Minimum Unit week.
..any other option is there..
Hi shahzad,
Have you tried increasing the time scale
go to format>timescale
there you can set the density for the duration by moving the slider to the right.
The bars automatically look longer
voila
regards
Slam
I have a new project base line programme.
duration is very less naturally bar length is short,
i want to increase bar length with out increasing duration to make a presentable bar chart.
if there is any way to do so..
I am using P3...
Thanks
hi Shahzad
i dont undertand your question again sorry,,
when you increase duration, the lenghth of bar should automatically increase.
in it?
cheers