using for matrix report

D
Davide Catuzzato 👤 Member for 22 years 1 month

Following Luca,



1st you should create a CBS, than you should integrate it with your code or cost account requirement.

If you don’t have to use a particular system I think excel can be properly used, throuht macro or sorting you can optain the needed roll-up.

If you need an XLS sample I can provide it.



ciao

L
Luca Basile 👤 Member for 22 years 11 months

See Davide which kind of cost matrix report.

Summarizing by cost accont and phases?

Or at which detail?

You canuse also report smith to do all this, or making an RA application.

Much easier link the P3 database with ODBC driver to excel or access make there your matrix reeport, with chart, pivot tables, etc ...

D
Davide Catuzzato 👤 Member for 22 years 1 month

Could you specify what do you mean by matrix report ??

Do you have to use a particular system e.s. (Primavera or MS project ) or you are talking about a simple spread sheet?



If the second one is the case which one will be your detail?

M
magdy girgis 👤 Member for 22 years

I have a Contract for a multi-story building and I need to produce a "Matrix Report" for the cost from the BOQ can you advise?

M
MK TSE 👤 Member for 24 years 3 months

Would you mind details your requirement?

btw, is this question be under other forum?



PP Note, topic moved to Planning Forum

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts