Get the WBS Magic Tool ( It’s free )

The Magic Tools family presents the WBS Magic Tool ( It’s free )

The fastest and the most accurate tool to design, present and export the WBS.

WBS Magic Tool features:

  1. Design and create the WBS for any project by very simple and easy ways without any previous experience.
  2. Use directly many ready-made examples included in the WBS Magic Tool.
  3. You can download tens of projects from direct links included in the Magic Tool.
  4. Export the WBS into Primavera as an Xer file directly.
  5. Read the WBS from any Primavera file and display it as a chart.
  6. Get the output of the WBSin 16 different formats as a table or chart or PDF or Xer.
  7. Display the WBS names with the names of the next above WBS level

In addition to :

  1. The Magic Tool performs all operations by Excel.
  2. The Magic Tool supports repeated loops and nested loops
  3. The Magic Tool designs and calculates the WBS codes automatically.
  4. The Magic Tool supports up to 50 WBS levels
  5. The Magic Tool can read and draw 50 Primavera files at a time.

This video link explains how to use the Magic Tool and all of its features:

https://youtu.be/pUUpGs6qYcc 

Download link:

http://www.mediafire.com/file/oe097k630nyrqwo/WBS_Magic_Tool.xlsm/file

 The WBS Magic Tool can be used with Excel 2007 and 2010 and with all versions of Primavera

M
Mohammed Ali 👤 Member for 8 years 2 months

Hi Zoltan,

Thank you for your advice , it's highly appreciated and will be considered in the near future.

I still have some tools that will be published in the coming days.

After I finish, I will try to modify the code to run on all Excel versions.

Z
Zoltan Palffy 👤 Member for 16 years 10 months

you are 10 years behind the excel version when are you going to update this ?

M
Mohammed Ali 👤 Member for 8 years 2 months

Hi Zoltan,

This is the last line in my post

The WBS Magic Tool can be used with Excel 2007 and 2010 and with all versions of Primavera

Z
Zoltan Palffy 👤 Member for 16 years 10 months

this does not work for my version of excel

[[wysiwyg_imageupload:7464:]]

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts