Dear All,
I have bought a new laptop and installed the latest version P6 18.8.
In Page setup, i want to save Schedule in A3 Size but there are only 2 options available (A4 and Letter).
Dear All,
I have bought a new laptop and installed the latest version P6 18.8.
In Page setup, i want to save Schedule in A3 Size but there are only 2 options available (A4 and Letter).
make sure that there is a default printer or select adobe as the printer
Is it OK ?
Thanks
I think that you must re install the pilot of your printer, because the format A3 depending of your kind of printer.