One of the issues with the integration of Primavera P6 and Deltek Cobra is how to best use the integration to update the Cobra WBS (Work Breakdown Structure) code file with the P6 WBS. Here we take a look at how to do this http://ow.ly/DFfO3082MOl
Mapping Primavera P6’s WBS in into Deltek Cobra’s WBS Code Field