I have filled my Oracle Database Express to about 80% fill and do not wish to excedd the size limit (done that before!)
Consequently I have Exported and the Deleted about 50% of the projects that I have in the database.
I then compacted the database, but there is no change in the size of the databse.
I then tried backing it up, and doing a restore on what should be a smaller database, this still reurned the same size database.
I have since copied another project and the database size has grown so I believe that even though I have removed projects thiis has actually not freed up any more space.
I am currently running P6 on a laptop in stanadalone mode.
Primaver P6 Version 7.0.0 (Build #: 00000092)
Database : Oracle Database 10g Express Edition Release 10.2.0.1.0
Windows 7 Service Pack 1 32 bit
Intel Core i5 @ 2.5Ghz
4GB Ram
Thanks,
Tried this over the weekend and still no joy.
Hugh,
You need to leave your laptop plugged-in and running over the weekend. Items that you delete are only marked for deletion. P6 ignores these records until them. A periodical maintenance routine is run (by default once a week on Saturday) that actually deletes the marked records and compacts the database. I am not sure of the time of day on Saturday this background process is executed.
I suppose that you could change the date that you computer is using to Saturday and run it early. I have never actually tried that.
Oh, by the way: The current P6 Version 7 is using Service Pack 5. Service Pack 0 is not going to cut it.