Senior Planning Engineer, MAN Enterprise,Qatar, Holiday Inn Hotel

START Date

MAN Enterprise, Qatar (July, 2010 to Present)

Major responsibilities include:

·          Preparation of planning and control procedures for project including detail master schedule using Primavera (P3&P6).

·          Preparation of work breakdown structure (WBS) for construction activities.

·          Ensure that all activities within the project are well planned, coordinated and be able to utilize all available resources.

·          Resource loading of quantities and man-hour in schedule.

·          Preparation of list of critical items and its close monitoring of critical activities.

·          Track progress and Critical Path including preparation of Progress Reporting and Mitigation / Catch –up Plan.

·          Monthly budget forecasts & financial monitoring of project using earned value analysis reports.

·          Emphasize the risk related issues & coordinate with stakeholders for their action to avoid any possible delays.

·          Assess the impact(s) of design/construction changes and schedule slippages. Support Contracts people on Variations (change orders).

·          Preparation of delay Claims/EOT applications due to change orders in line with contractual clauses & entitlements.

·          Liaise and work with multi disciplinary project personnel in work development and maintenance.

·          Prepare and update monthly project reports, verify progress report and attending site meeting.

·          Ensure that all works carried out in accordance with approved schedule and requirements.

·          Tendering Schedule.

Currently working on the following Projects:

June 2014 to Present                Holiday Inn Hotel (4 Star)                                                                 

Designation: Senior Planning Engineer

Client / Engineer:  Holiday Inn Hotel.

Location: Doha, Qatar

May 2013 to June 2014             Oxygen Park at Education City                                                        

Designation: Senior Planning Engineer

Client / Engineer:  Qatar Petroleum.

Location: Doha, Qatar

July 2010 to October 2013       North Infrastructure Site Wide (NSIP) Qatar Foundation

Designation: Senior Planning Engineer

Client / Engineer:  Qatar Petroleum.

Location: Doha, Qatar

August 2012 to January 2013Construction of Multi Purpose Hall at Al Sadd Sports Club

Designation: Senior Planning Engineer

Client / Engineer:  Qatar Olympic Committee.

Location: Doha, Qatar

June 2012 to January 2013     Car Park at Intercontinental Hotel

Designation: Senior Planning Engineer

Client / Engineer: Intercontinental Hotel.

Location: Doha, Qatar

 

BEMCO Contracting Company Qatar W.L.L (August 2008 to July 2010)

Major responsibilities include:

·          Preparation of master schedule on level III/IV for construction activities of projects schedule using Primavera (P3 & P6).

·          Preparation of work breakdown structure (WBS) for construction activities.

·          Resource loading of quantities and man-hour in schedule.

·          Monitoring and reporting of weekly & monthly progress of project with narrative report, progress s-curve and manpower histogram.

·          Preparation of list of critical items and its close monitoring of critical activities.

·          Preparation of quarterly project review report for observation & comments.

·          Preparation of 1 month/3 months forecast/look-ahead schedule.

·          Generation of weekly and monthly targets from Primavera for construction team.

·          Management of daily man-hour & manpower record as per WBS.

Worked on the following Projects:

April 2010 to July 2010             New Doha International Airport Project (NDIA)

                                                        Utilities Package-13

Designation: Planning Engineer

Client / Engineer:  NDIA / Overseas Bechtel Inc.

Location: Doha, Qatar

Project Value: QAR 2.6 Billions

 

Aug, 2008 to Apr, 2010             Bahrain Bay Development Project, Bahrain

                                                        Designation: Planning Engineer

Client / Engineer:  BBU/Dalkia

Location: Bahrain

Project Value: BD 136 Million

Paragon Constructors (PVT) Ltd, Pakistan (Oct 2007 to August 2008)

Major responsibilities include:

·          Schedule the project in logical steps and budget time required to meet deadlines.

·          Ensure that all civil activities within the designed areas are well planned, coordinated and be able to utilize all available resources in coordination with other functional Manager in directing and supervising all involved site personnel & subcontractors.

·          Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors.

·          Study job specifications to determine appropriate construction methods.

·          Requisition supplies and materials to complete construction projects.

·          Prepare and submit budget estimates and progress and cost tracking reports.

·          Develop and implement quality control programs.

·          Take actions to deal with the results of delays, bad weather, or emergencies at construction site.

·          Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.

·          Plan, organize, and direct activities concerned with the construction and maintenance of structures, facilities, and systems.

·          Investigate damage, accidents, or delays at construction sites, to ensure that proper procedures are being carried out.

·          Evaluate construction methods and determine cost-effectiveness of plans, using latest computer software (Primavera).

·          Developing the programmed of work and strategy for making the project happen.

·          Complies with the highest level of health, safety and zero accident during all stages of project execution and pro-active with safety groups & subcontractors to promote safe and hazardous free work within the designated area. 

·          Using construction management software packages to plan smooth work flows.

·          Communicating with a range of people including the client, subcontractors, suppliers, the public and the workforce.

Worked on the following Project:

Oct 2007 to Aug 2008               Bosicor Oil Refinery, Pakistan

Designation:  Construction Manager Civil

Client: Bosicor (PVT) Ltd, Pakistan

Location: Karachi, Pakistan

Project Value: Pak 400 Millions

Descon Engineering Ltd. Qatar (April 2006 to October 2007)

Major responsibilities include:

·          Watch and inspect the construction work and assure that it is done in full accordance with the drawings, technical specifications and bills of quantities.

·          Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc., required for all civil works prior to execution.

·          Supervising the works on site in accordance with the contract documents and using the template and procedure established by the consultant.

·          Inspecting and testing materials prior to their use at site as per sample approved by the consultant and ensuring removal of rejected material out from site.

·          Ensuring the correct implementation of the works according to technical specifications, to designs and quality of materials.

·          Preparing list of tests that may be required and following these tests to be carried out at site. Keeping a log of all test conducted at site.

·          Checking and testing of completed works, taking photos on a regular basis and also on account of defective work.

·          Checking and ensuring that the site is arranged as per the site management plan and that all measures are taken for site safety and the safety of the third parties in the vicinity of the site

·          Prepare weekly report and suggest and instruct additional safety measures if needed.

·          Update of work plan of the contracts – monthly.

·          Preparation of list of critical items and its close monitoring.

Worked on the following Project:

Apr 2006 to Oct 2007                Ras Laffan Olefin Project

                                                        Designation: Area Planner & Site Engineer

Client: Technip (France).

                                    Location: Ras Laffan Industrial City, North Coast, Qatar 

Project Value: QAR 3.2 Billions

Paragon Constructors (Pvt) Ltd, Pakistan (Dec 2004 to April 2006)

Major responsibilities include:

·          Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc., required for all civil works prior to execution.

·          Assign targets for accomplishments and ensure targets are met on daily basis for all civil groups at site.

·          Monitors the actual physical works at site.

·          Setting out, leveling and surveying the site.

·          Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.

·          Directly responsible for the safety of all civil groups’ personnel of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards.

·          Prepare weekly and Monthly Reports.

 

Worked on the following Projects:

Dec 2005 to Apr 2006                Dolmen City (High Rise Building), Karachi, Pakistan                      

Designation:  Site Engineer

Client: Dolmen Builders, Pakistan

Project Value: Pak 4.3 Billions

 

Dec 2004 to Dec 2005               Lucky Textile Mills # 4, Karachi, Pakistan

Designation: Management Trainee & Site Engineer

Client: Lucky Textile, Pakistan

Project Value: Pak 600 Millions