Position
Deputy Project Manager/Senior Project Controls & Planning Manager
Project
Burj DAMAN at the Dubai International Financial Centre (DIFC)
Description: 60 story mixed use towers incorporating 5 star hotel, commercial/office, residential, branded apartments and penthouses, recreational/community floors, retail space, conventional/automated car park and a providing a total area of some 1.6 million square feet Gross Floor Area (GFA 148,000 square meters) of accommodation; and a total Built-up Area of 3.2 million square feet (BUA 296,000 square meters).
Client
DAMAN REAL ESTATE CAPITAL PARTNERS LTD.
Contract Value
AED 1.5 Billion (US$ 407 Million)
Project
The Langham, Palm Jumeirah – Five Stars Hotel
Description: The project involves construction of a 5 star hotel comprising a basement level, a ground floor and 7 additional floors offering 323 rooms equipped with the latest amenities, all with a sea view and direct access to a private beach Located on the Crescent of The Palm Jumeirah. The hotel consists of two wings inter-connected with Sky Bridge and serviced with a Robotic Parking. The external works include Landscape, Water Feature, Swimming Pools, Kids Pool, Seafood Restaurant, Ramp to Main Entrance at third level and Boundary Walls.
Client
DAS REAL ESTATE Co. LLC.
Contract Value
AED 386 Million (US$ 100 Million)
Duties
× Develop, monitor and update Project Master Schedule
× Develop and maintain Project Specific Programmes, Work Plans,
Procedures and Methodologies.
× Develop and maintain Project WBS
× Develop and maintain Project Management Plan (PMP) including
Communications Procedure & Change Control Procedures
× Develop and maintain Project WBS
× Value & Risk Analysis/Management
× Prepare delay analysis reports for all EOT claims
× Manage packages of employer direct contractors
× Prepare Project Controls guidelines for procurement of consultants and contractors
× Prepare and submit Monthly Reports to the Employer
× Develop and maintain project information system including
information accumulating and reports
× Prepare variance reports in reference to time and cost
× Review the Consultants/Sub-Consultants design Schedules/Reports
× Review the Main Contractor/Sub-contractors Schedules/Reports
× Preparation/Evaluation of Cost & Time impacts