Abdulla Ahmad Dossary Co Planner

•     Developed the critical path construction plan and schedule for the procurement and construction phase of the project.

•     Worked with project scheduling team to produce the best workable project schedule.

•     Developed manpower requirements by craft to match the volume of work and schedule.

•     Responsible for the cost control consisting of issuance of man-hour budgets to the field to be used in developing periodic performance reports.

•     Modified the original main office prepared construction/installation schedule to reflect site conditions by revising the logic and/or additional details to the summary activities update as required.

•     Revised the original prepared construction progress report to keep it current with the network revisions.

•     Prepared short term time table and look ahead schedules to support construction / installation to foresee and monitor ongoing work activities.

•     Performed schedule analysis for changes in scope of work and makeup studies.

•     Prepared craft manpower curves.

•     Prepared progress status reporting forms for supervisors.

•     Supported construction reporting tasks as required, such as construction status report, major equipment and materials, manpower effectiveness and job progress etc.

•     Maintained planning and scheduling site files.