• Developed the critical path construction plan and schedule for the procurement and construction phase of the project.
• Worked with project scheduling team to produce the best workable project schedule.
• Developed manpower requirements by craft to match the volume of work and schedule.
• Responsible for the cost control consisting of issuance of man-hour budgets to the field to be used in developing periodic performance reports.
• Modified the original main office prepared construction/installation schedule to reflect site conditions by revising the logic and/or additional details to the summary activities update as required.
• Revised the original prepared construction progress report to keep it current with the network revisions.
• Prepared short term time table and look ahead schedules to support construction / installation to foresee and monitor ongoing work activities.
• Performed schedule analysis for changes in scope of work and makeup studies.
• Prepared craft manpower curves.
• Prepared progress status reporting forms for supervisors.
• Supported construction reporting tasks as required, such as construction status report, major equipment and materials, manpower effectiveness and job progress etc.
• Maintained planning and scheduling site files.