Project Control Tolerance

Hi All,

how can i define the project control tolerance criteria for schedule, cost and quality? what is the base?

best,

moutaz

Z
Zoltan Palffy 👤 Member for 16 years 10 months

for float it does not depened on a project size 

for cost it does not depened on size

fro quality it does depend on size and you would have to nornmalize the deficencies basd on the size of the project 

M
moutaz aldeib 👤 Member for 22 years 5 months

thanks Zoltan, my question is: Is there a specific rule depends on the size of the project?

best,

muataz

Z
Zoltan Palffy 👤 Member for 16 years 10 months

you can define and set that threshold in terms of float. ie the schedule falls behind schedule by -20 days then a revised schedule will be requested. If the forecasted cost above the budgted amount by X % then a red flag goes up. If the number of deficencies  reaches a certain % then a red flag goes up and investigation begins as to what the root cause for the deficiencies is and recommendation on how to correct it. 

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts