I am new in planning section . I am now preparing a planning sheet regarding fabrication work. kindly guide me how much productivity and manpower will consider in verious section fabrication.like
1. shop floor heavy fabrication .
2 . on site structure fabrication like gallery , tressel etc.
In general what is the thumb rule to calculate fabrication productivity ..
please meil me the suggession.
thanks & regards,
Pinaki Majumdar
at the top of this page click on the tab labeled RATES
One fabrication team like 1 fitter , 1 welder , 2 helper can fabricate how much ton steel per day as per planning thumb rule ??
kindly suggest me .