To Hannes: Ive sent you another file. I think the one that I sent you is locked for Windows XP. I sent you the file which you can edit the map of the database
thank you for sending first impression is very good, but I have a problem: after opening, I get the error as descriped, but your solution does not help me. The menu-item tools-> database Utilities is not available at this stage yet...
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
HI Artagnan
THANKS
BUT I MEAN IN PRIMAVERA P6
YOURS
ALAA
men too please my email is djouallah_mimoune at yahoo dot com
thanks very much
To Hannes: Ive sent you another file. I think the one that I sent you is locked for Windows XP. I sent you the file which you can edit the map of the database
You are talking about the excel sheet right? These are just a matter of the chart tools. Right click on the chart and see all the options.
HI
WHERE CAN I FIND TOOLS AND OPTION TO CHANGE ON ACTIVITY USAGE PROFILE LIKE CHANGE MAXIMUN VALUE ON VERTICAL AXIX ANSD SO ON
THANKS
ALAA
Hello d Artagnan
thank you for sending first impression is very good, but I have a problem: after opening, I get the error as descriped, but your solution does not help me. The menu-item tools-> database Utilities is not available at this stage yet...
Hannes
Already sent to your mailboxes guys. I hope to get some feedback.
can you send me a copy.my id [email protected]
D. Artagnan,
Please send me the program at [email protected]
Thanks A LOT!
John
guys, i will send it tomorrow morning...
To all who have downloaded the program, please send me feedback. Thanks.
To anbin, thanks for the feedbacks.
Dear Artagnan
thank you for your cooperation soul
can you please send to me on
[email protected]
Working with Windows Vista SP1, MS Office 2007, Primavera 6.2.1 with SDK. Moved the mdb file to C: also.
Well the tables got connected but macros in Access return following error.
Read Only : Database has been opened read only.you can only change data in linked tables.To make design change, save a copy of database.
After extracting when you want to update either S curve or Resource, again error pops up, it says "Could not delete from Specified tables"
Where am I wrong, any help will be highly appreciated.
Hi D Artagan,
Can you also send me a copy at [email protected]
Thanks in advance.
Thank you & Best Regards,
Aryan
Guys I have sent them already. I would really appreciate it if youll have some feedbacks.
Hello D. Artagnan
sounds great, could you please send me a copy to
[email protected] As I am working with suff like that as well, im very interested to see it
Thanks
Hannes
Dear Artagnan,
Can you send to me also at [email protected].
Thank you in advance.
Johar
Artagnan,
Can you please send it to me as well at [email protected]
Thank you
Najib
Dear Artagnan,
Can you send to me also at [email protected].
Thank you.
Chandar
I have also included columns for stored period quantities, so you can use them for the analysis.
Dear D.Artagnan,
Thanks for the information and source provided by you.
Its working for me.Really good stuff linking P6 with MS Access and Excel.
Thanks a Lot
Regards,
Anbin Ponnith P
hi,
Can u send me the same at [email protected].
Thanks alot in advance
D. Artagnan,
Please send me the program at [email protected]
Many thanks,
R. Catalan
Hi Marie,
What if your schedule is not resource loaded, are there any other ways you know that you can generate s-curve without resource loading?
Regards
Dear D
Please could I get a copy too for S curve [email protected]
Please send the S Curve to me also ....
xxx
With regards
Arun Vasanth
Pagination