Hi Matthew
Welcome to Planning Planet and thanks for your contribution.
You have answered a thread that is more than 7 years old.
In future please keep your most welcome responses to current topical threads.
Best regards
Mike Testro (Moderator)
I have documented the process here
http://www.cranecrews.com/1/post/2013/04/removal-of-tower-crane.html
A 400m high crane is usually built alongside the building not inside however on the rare case it is built inside a shaft then a removal crane and winches will be set up on the roof to take down the tower crane and lower to the ground. The removal crane is designed to be transported via the buildings lift
Basel
here is a link for you to check http://science.howstuffworks.com/tower-crane.htm
hope this helps...
Cheers!
Christian
Sometimes they are not! I have seen several instances where they are built into the structure with only the boom removed.