Manpower/Cost Ratio between PMC and EPCC Contractor

D
Devamalya De 👤 Member for 20 years 8 months

It will b anything b/w 1 - 2.5%. Less the project cost higher the % age and higher the project cost, lower the %age. For a project of USD 100 m, PMC fees is most likely to be in the 1.00 - 1.25% range upto a max of say 1.50%.