Planning Engineer , Eneco, Various
Eneco - Planning and Risk Engineer
For the development, contracting and construction of several North Sea offshore wind farms I fulfilled the role of planning and risk engineer
George Plop
800x600
Normal
0
false
false
false
EN-GB
Engineering Planner, GE Oil & Gas, 15 GE frames F Open Cycle Oil Power Plant project
Summary of my responsibilities are:
Benjamin Feng
I am a project planner with 8 years of experience in Project Planning and Controls, specializing subsea manufacturing equipment and rig-building and have handled several large scale projects varying from ranging from 200 to 700 million dollars in value.
Jay Antoni
Consultant and Project Controls Manager, Transnet Port Terminals / Transnet Pipelines, Transnet Port Terminals / Transnet Pipelines
Project Controls Manager
Transnet Pipelines / 2014 - 2015
Transnet Port Terminals / 2004 - 2014
Projects:
• PMO Office Set-up, Management and linking of MSP / Primavera to SAP ERP Modules at TPT
• SAP Blueprint Design and Roll-out at TPT
• Change Management at TPT:
• Capital Investment Programme at TPT:
Sam Spiehler
shivam garg
Royce Zeigler
Project Controls Moore-Controls System @ Present
Project Controls Manager Midstream EPC and Turnarounds (Refinery)
Sr. Construction Manager Upstream and Downstream EPC Projects