Primavera P6

Steven Wilcock

First Name
Steven
Last Name
Wilcock
Professional Since
Oldest experience
Years Experience
28
Guild Accreditation
GPC Member
GPC Pilot Tester

I am an enthusiastic, self motivated Planning Engineer, working within the Oil & Gas and the Fabrication / Construction industry for over 21 years (of which the last 14 years have been as a Planning Engineer). In this time I have worked on LNG Tank / Terminal projects, Gas Compressor Station Expansion projects, Gas Pipeline / Diversion projects, Shutdowns, Ambient Tank projects, general Construction / Fabrication projects and Design only projects.

Deon Visagie

First Name
Deon
Last Name
Visagie
Professional Since
Oldest experience
Years Experience
34
Guild Accreditation
Awaiting Applicant
GPC Member
Telephone Number
+61400611677
LinkedIn Profile
https://www.linkedin.com/in/deon-visagie-412a6113/

Forensic Planning

Subject Matter Expert” with regards to Forensic Planning in “Extension of Time“ cases.

Implementation of AACE International (The Authority for Total Cost Management) protocols to streamline defense data for Mediation and Arbitration.

Renzo Constenla Bravo

First Name
Renzo
Last Name
Constenla Bravo
Professional Since
Oldest experience
Years Experience
40
Telephone Number
56 2 27558318

Project Controls Manager (planning and scheduling, budgeting, progress evaluation, S-curves & EVM, re-scheduling, resource analysis, histograms, performance analysis, cost control, engineering&construction contracts control, reports, risk analysis, lean construction, last planner, claims) in mining (copper, steel, gold, sulphuric acid, desalination), power and cellulose industry.

Forenic Planner, Rio-Tinto, Proplan, Turner & Townsend, Mongolia

START Date
END Date
Experience Hours (Planning & Scheduling)
700
Experience Hours (Cost Management)
150
Experience Hours (Forensic Analysis)
1000

Rio Tinto – Mongolia Class action Defense.

Part of defense team to defend Rio Tinto against a class action investor lawsuit.

1. To convert complex Deswik mining schedules into Oracle P6 in such a manner a window analysis methodology can be used to determine true critical paths in various parts of the mining process over various time intervals.

2. Apply this windows analysis methodology to defend class action claims

Rick walton

First Name
Rick
Last Name
walton
Professional Since
Oldest experience
Years Experience
14
LinkedIn Profile
http://www.linkedin.com/profile/view?id=31271265&trk=tab_pro

Initially Starting my career as a Geotechnical engineer I moved into heavy civil engineering as a Tunnelling engineer in the late 90's  I have since moved on and now practice as a management consulting professional with extensive programme and project management expertise that has been applied across multiple industries to include heavy civil engineering (tunneling), nuclear decommissioning, water / waste utilities, telecommunication and road construction.

Project Control & Risk Manager, Krida B.P. - SAE - ETI, Infrastrcuture, Dust Aglomeration Facilities

START Date
Experience Hours (Planning & Scheduling)
5000
Experience Hours (Cost Management)
1500
Experience Hours (Forensic Analysis)
3500

Tackling the management of our existing plant facilities entails a multifaceted approach that requires meticulous attention to detail and strategic planning. At the core of this endeavor is the implementation of a comprehensive maintenance program. This program is designed to ensure the uninterrupted operation of our facilities, extending their lifespan while minimizing downtime and associated costs. One critical aspect of managing this program involves scheduling repairs and maintenance activities in a well-structured manner.

Project Control & Risk Manager, Krida B.P. - SAE - ETI, Infrastrcuture, Dust Aglomeration Facilities

START Date
Experience Hours (Planning & Scheduling)
5000
Experience Hours (Cost Management)
1500
Experience Hours (Forensic Analysis)
3500

Tackling the management of our existing plant facilities entails a multifaceted approach that requires meticulous attention to detail and strategic planning. At the core of this endeavor is the implementation of a comprehensive maintenance program. This program is designed to ensure the uninterrupted operation of our facilities, extending their lifespan while minimizing downtime and associated costs.

One critical aspect of managing this program involves scheduling repairs and maintenance activities in a well-structured manner.

Ahmed Al-Jubouri

First Name
Ahmed
Last Name
Al-Jubouri
Professional Since
Oldest experience
Years Experience
53
LinkedIn Profile
https://www.linkedin.com/profile/public-profile-settings?trk=prof-edit-edit-public_profile

SUMMARY OF PROFILE

Keith Farrell

First Name
Keith
Last Name
Farrell
Professional Since
Oldest experience
Years Experience
20
Guild Accreditation
GPC Member
GPC Pilot Tester
Telephone Number
+61 407612348
LinkedIn Profile
https://au.linkedin.com/in/keithfarrell

An experienced Project Controls Profesional with a demonstrated ability to develop and lead high profile project schedules, pinpoint core problems, improve performance and transform obstacles into opportunities. Widespread experience of project management methodologies across all project phases in a variety of industries.

KEY STRENGTHS