scheduling

updating and working plans to record progress and spend

Planning Manager or Project Controls Manager, Bechtel international, Numerous

S
Sean Regan 👤 Member for 18 years 9 months
START Date
END Date
Experience Hours (Planning & Scheduling)
22000
Experience Hours (Cost Management)
7750
Experience Hours (Forensic Analysis)
1500

Planning and Scheduling engineering, Construction Inspector, and Construction Superintendent for Small projects in Los Angeles and mcCarran Airport Expansion.

Lead Planenr and Scheduler - Savannah River site High level Waste  and Small projects

Lead Planner and Estimator - bechtel Environmental Navy RAC Projects

Project Controls Lead - Nevada Test Site Transition team on multiple proejcts

Lead Planner and Project Manager - Lucent Telecommunications Project TEP 6 Saudi Arabia

PLANNING ENGINEER, Al Hubra Trading & Contracting LLC, Project Planning & Expediting

M
Mufiz Sayed 👤 Member for 17 years 8 months
START Date
END Date
Experience Hours (Planning & Scheduling)
1000
Experience Hours (Cost Management)
950

Al-HUBRA TRADING & CONTRACTING LLC.,Oman                                                         

Project Planning Engineer, Modern Arab Construction Co.- Saudi Arabia, Tanajib Sea Water Expansion Project - Saudi Arabia

START Date
END Date

1- Preparation of Schedules 2- Updation of Scheduling 3- Preparation of Daily Manpower & Equipment Reports 4- Progress & Status Reports 5- Estimation of Resources 6- Cost Control Reports

Project Planning Engineer, Modern Arab Construction Co.- Saudi Arabia, Tanajib Sea Water Expansion Project - Saudi Arabia

START Date
END Date

1- Preparation of Schedules 2- Updation of Scheduling 3- Preparation of Daily Manpower & Equipment Reports 4- Progress & Status Reports 5- Estimation of Resources 6- Cost Control Reports

Senior Planner / Planning Manager, Rhead Group, UKCCS Demonstration Competition, London Underground SSL, South Wales Pipeline, EGMP Enhanced Gas Measurement Project

START Date

-          National Grid Carbon: UKCCS Demonstration Competition (Carbon Capture and Storage).

-          London Underground SSL Project Tender.

-          Forensic Planning and Delay Analysis (CNI).

-          South Wales Pipeline Project - Reinstatement Works.

-          Siemens plc (Major Projects & Electrification) - Tender Programmes.

PROJECT ENGINEER, PRY TORTOLA AND TORTOLA DESIGN GROUP, Residential Buildings, ROADS AND CULVERTS, SEMI AUTOMATED POULTRY HOUSES (5000 HEADS CAP)

START Date
END Date
  • Conduct site visit of the proposed project, gather data for the construction of TEMFACIL and check the existing condition of the project site for heavy equipment utilization in clearing and cutting to required slope.
  • Lead in the preparation of Project Plan and Schedule, Bill of  Materials, Scope of Works, Construction Technical Specifications and Project Quality Plan for Design and Build projects.
  • Conduct site visits to subcontractors and suppliers to determine adequacy of plant (for ready mix concrete batching plant), methods of delivery and their reputation

PLANNING ENGINEER / QS, LOCAL GOVERNMENT OF THE PHILIPPINES, GOVERNMENT VARIOUS PROJECTS

START Date
END Date
  • Preparation of project master schedule.
  • Preparation of the project resource assignment, S-curves and histograms.
  • Review project concerns and ensure follow up actions to close issues.
  • Establish interim milestones and mitigate project critical items
  • Preparation of weekly and monthly progress reports
  • Scheduling & leveling of resources.
  • Progress spotlights and updating of schedules.
  • Provide look aheads, 3 weeks and monthly.
  • Estimating, Costing and budgeting
  • Raise flag for potential impacts on co

CIVIL / PLANNING ENGINEER, ARAMCO-KJO THRU: BHSC, Replacement of Pipe Sleepers in GOSP, Replacement of Oil Tank Foundation and Dikes, Replacement of Machinery Foundation in Power Plants and Flare , Offshore Maintenance Works in Oil Rig / Platform, Minor C

START Date
END Date
  • Prepare project master schedule and project detailed schedules.
  • Monitoring and Controlling of the integrated schedule of all project activities including Civil, Mechanical and Electrical during the construction phase.
  • Prepare reports on Baseline vs Current Schedules plus analysis on forecast for weekly progress report to the top project management team.
  • Interface with Engineering, Construction and Commissioning activities to align activities according to plan
  • Preparation of float and critical path analysis
  • Issue Project Weekly/Monthly