Risks

Junior / Intermediate Planners, MGMC Ltd, Client projects

START Date
END Date

Project control & Scheduler for Government Agency

 

The main focus of the role is the capability of creating plans for the full Project lifecycle (including development, design, phases, etc.).  Working with Project Managers to develop a control environment including: document control, risk, change, schedule detailed plans and cost in accordance with client procedures.

Project Manager/Project Control Manager, Real Estate Solutions, AlMasalleh Towers

T
Tarek Gamil 👤 Member for 21 years 8 months
START Date
END Date
Experience Hours (Planning & Scheduling)
3000
Experience Hours (Cost Management)
3000
Experience Hours (Forensic Analysis)
3000

Refer to the Project Control Manager and Senior Contract Administrator positions in the Profile page.

Project Manager, Professional Project & Programme Management Limited, IT Systems Implementation

R
Rod Baker 👤 Member for 25 years 4 months
START Date

I am an experienced, successful and accredited Project, Programme, Portfolio andPMO Manager.  I have a particular skill in turning round projects and programmes that are ‘in trouble’ and I have an earned reputation for getting things done.  I manage complex stakeholder relationships by building strong personal and corporate links with people.  A particular speciality is the definition and management of technical and business risks.

 

Senior Planning & Project Controls Engineer, Consolidated Contractors Company CCC / McConnell Dowell (JV), Baku - Tbilisi - Ceyhan Crude Oil Export Pipeline (BTC) Project, Baku, Azerbaijan. The Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline is to export

START Date
END Date

Duties included preparing Front End Load (FEL) documents in order to mobilise and start work in Pipe Yards and Camps; initiating method statements, risk assessments, and scope and schedule of works; managing CPM Schedule of works for pipe dump yards and camps.

PLANNING MANAGER, China State Construction Engineering Corporation (CSCEC), MTR & KCRC Railway Projects, Site Development, Disneyland Project

START Date
END Date

1. JORDAN VALLEY SITE DEVELOPMENT Project in Hong Kong. It compasses a 1 Million cu.m. Rock Blasting/Excavation and built the longest Rock Conveyor, new roads and subway tunnels.



2. KCRC SOUTERN LINK RAILWAY TUNNEL (KDB300 & 200). More than 2 km floating railway tunnel construction using open-cut excavation, massive diaphragm, bored piles, secant walls, temporary sheet pile cofferdams, ground freezing, sophisticated ground investigation and instrumentations. In-charge of the tendering package and the project construction baseline.