Assistant Planner or Planning Engineer, Costain, Thameslink - London Bridge Station Redevelopment

START Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
500

2013 – 2015 Current works – Costain - London Bridge Station Revelopment (as part of the Thames link programme worth £6.5 Billion):
I currently work for Costain at London Bridge Station Redevelopment, since working here I have experienced planning for civil works undertaken by Costain (otherwise known as self-delivery works) and Early works such as demolition, piling and drainage (which have been part self-delivery and part subcontracted).
I do both short term and long term planning.

Assistant Planner or Planning Engineer, Costain, Thameslink - London Bridge Station Redevelopment

START Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
500

2013 – 2015 Current works – Costain - London Bridge Station Revelopment (as part of the Thames link programme worth £6.5 Billion):
I currently work for Costain at London Bridge Station Redevelopment, since working here I have experienced planning for civil works undertaken by Costain (otherwise known as self-delivery works) and Early works such as demolition, piling and drainage (which have been part self-delivery and part subcontracted).
I do both short term and long term planning.

Global Recruiters, GLC Group, Permanent and Contract

G
GLC Group 👤 Member for 14 years 6 months
START Date

The GLC Group is a specialist technical recruitment consultancy, focusing on mid to senior level applicants for contract and permanent roles.



Our reputation is built on the delivery of a service that goes beyond traditional recruitment practices, and is what attracts clients and candidates of the highest caliber to our door.



We aim to offer solutions to companies small and large, specialist to generalist, dynamic or compact. Our efforts are reflected through our Leaders, Determination and the magic of Teamwork.

PLANNING MANAGER, China State Construction Engineering Corporation (CSCEC), MTR & KCRC Railway Projects, Site Development, Disneyland Project

START Date
END Date

1. JORDAN VALLEY SITE DEVELOPMENT Project in Hong Kong. It compasses a 1 Million cu.m. Rock Blasting/Excavation and built the longest Rock Conveyor, new roads and subway tunnels.



2. KCRC SOUTERN LINK RAILWAY TUNNEL (KDB300 & 200). More than 2 km floating railway tunnel construction using open-cut excavation, massive diaphragm, bored piles, secant walls, temporary sheet pile cofferdams, ground freezing, sophisticated ground investigation and instrumentations. In-charge of the tendering package and the project construction baseline.

Assistant Project Manager / Project Planner, John Doyle Construction Ltd, Various

START Date
END Date

Project Planner / Assistant Project Manager

1 Coleman Street, Structural concrete to office development on Coleman Street by Moorgate Station, London

Client: Stanhope and Bovis Lend Lease

The scheme includes major ground works, substructure concrete, and steel frame superstructure with in-situ concrete slabs.

 

2004 – 2005 Assistant Pr