Worked as planning Engineer. responsible for Project Schedule, Schedule update and MIS Reporting for Onshore,Offshoe,Projects,CBM Projects, offshore drilling schedules.
t was clear from the offset that a different strategy would need to be developed in Saudi Arabia to bring 21 Projects in align with Western Standards and getting the Project online. After screening all the Schedules I was able to identify 10 Disciplines that almost all the Schedules were missing and develop a scoring mechanism to score each Schedule.
Invited to work on Crossrail as a Consultant, I was asked to perform the task in integrating Design, Procurement & MEP Fit Out. These items were still at tendering logic and it was recognised that this logic no longer demonstrated the true critical path.
Planning & Coordination Manager – Quantity Surveyor – C. W. control
SETEC Industries (french engineering company ; ) – Rouen – France
Project Management of a tramway capability improvement : new railtracks and railtracks extension, new streetcars (27 Alstom Citadis streetcars instead of Alstom TFS), new equipments (tramways cleaning and washing equipment, sand distributor, under-floor wheel lathe), new maintenance building.
From Bocagrande Shipyard, I improved the planning of the PLAN ORIÓN – Overhaul of Colombian Navy Frigates, the projects in development, and those forecast.