Planning and Scheduling Manager, CLM Delivery Partner, London 2012

START Date
END Date
Experience Hours (Planning & Scheduling)
8000
Experience Hours (Cost Management)
2000

Planning and Scheduling Manager working on Venues of the 2012 Olympic Park.

I was responsible for administration of the Programme for the Olympic Stadium and the Aquatics Centre.  This included managing the programme for the NEC, reporting performance from the contractors programmes running risk analysis of the programmes and integration with other projects on the Olympic Park.

Sr. Planning Engineer, Jaka Property Development & Management Corporation, Splendido Taal Golf Course and Country Club; Jaka Tower; Bridgeport Housing Project

START Date
END Date

Worked as a Sr. Planning and Cost Engineer for Jaka Property Development and Management Corporation for Splendido Taal Residential Golf and Country Club project, Jaka Tower and Bridgeport Housing Project.

Consortium Planning Manager, SINO Group, Olympian City 1 & 2 Development

START Date
END Date

Overall in-charge of the PROJECT PLANNING/SCHEDULING & CONTROL of the three(3) simultaneous large scale Airport Core Development projects, "OLYMPIAN CITY 1 & 2" in Tai Kok Tsui, HK, which include:

PLANNING MANAGER, China State Construction Engineering Corporation (CSCEC), MTR & KCRC Railway Projects, Site Development, Disneyland Project

START Date
END Date

1. JORDAN VALLEY SITE DEVELOPMENT Project in Hong Kong. It compasses a 1 Million cu.m. Rock Blasting/Excavation and built the longest Rock Conveyor, new roads and subway tunnels.



2. KCRC SOUTERN LINK RAILWAY TUNNEL (KDB300 & 200). More than 2 km floating railway tunnel construction using open-cut excavation, massive diaphragm, bored piles, secant walls, temporary sheet pile cofferdams, ground freezing, sophisticated ground investigation and instrumentations. In-charge of the tendering package and the project construction baseline.

Senior Planner, ELB Engineering Services, 1) Sierra Leone Stockyard Upgrade, 2) Tonkolili Mine Stackers 3) Goldfields Mine Expansion

START Date
END Date
Experience Hours (Planning & Scheduling)
3500

Bulk Materials Handling Equipment Design, Engineer, Procure, Fabricate and Erect planning.

Develop Baseline schedules.

Plan resource assignments.

Develop deliverbale measurement tools and measure progress.

Cost S-curves.

Reporting.