PROJECT CONTROL

EPS Deputy Manager, PROMAN ec, Several / Sarir,// H2 Pilot plant in Carregado, etc

START Date
END Date
Experience Hours (Planning & Scheduling)
2200
Experience Hours (Cost Management)
6050
Experience Hours (Forensic Analysis)
800

EPC Deputy Manager and Planning Manager

Responsible for all projects coordination as delegated by the EPC department manager.

Leading a team of planner in several projects in all phases (offer, detail, execution, closing) .

Projects ranging from Oil and Gas to Power plants, Hidrogen, etc.

 

Projects location in Canada, Portugal, Lybia, however managed from Lisbon (Portugal)

Project Control & Risk Manager, Krida B.P. - SAE - ETI, Infrastrcuture, Dust Aglomeration Facilities

START Date
Experience Hours (Planning & Scheduling)
5000
Experience Hours (Cost Management)
1500
Experience Hours (Forensic Analysis)
3500

Tackling the management of our existing plant facilities entails a multifaceted approach that requires meticulous attention to detail and strategic planning. At the core of this endeavor is the implementation of a comprehensive maintenance program. This program is designed to ensure the uninterrupted operation of our facilities, extending their lifespan while minimizing downtime and associated costs. One critical aspect of managing this program involves scheduling repairs and maintenance activities in a well-structured manner.

Project Control & Risk Manager, Krida B.P. - SAE - ETI, Infrastrcuture, Dust Aglomeration Facilities

START Date
Experience Hours (Planning & Scheduling)
5000
Experience Hours (Cost Management)
1500
Experience Hours (Forensic Analysis)
3500

Tackling the management of our existing plant facilities entails a multifaceted approach that requires meticulous attention to detail and strategic planning. At the core of this endeavor is the implementation of a comprehensive maintenance program. This program is designed to ensure the uninterrupted operation of our facilities, extending their lifespan while minimizing downtime and associated costs.

One critical aspect of managing this program involves scheduling repairs and maintenance activities in a well-structured manner.

Senior Manager - Project Control , MACE GROUP LIMITED, GIGA Projects

START Date
Experience Hours (Planning & Scheduling)
4050
Experience Hours (Cost Management)
4150
Experience Hours (Forensic Analysis)
3650
  1. Project:Diriyah Gate Programme – Riyadh, Saudi Arabia

       Client: Diriyah Gate Development Authority

  1. Project:7 Star+ ‘Royal Standard’ luxury-built assets (villas, palaces) for very high net worth individuals

       Client: Confidential

  1. Project:Expo 2020 project for the Self-Build packages- Dubai, UAE

       Client: EXPO

Sr. Planning Engineer, Shapoorji Pallonji Mid East LLC, King Abdullah Financial District (Cluster CP03A)

START Date
  • Managing and leading the team of planners.
  • Preparing level 1,2,3,4 & 5 programs along with Schedule basis memorandum, progress measurement procedure, organization chart and logistical plans.
  • Reviewing the baseline Program, S-curves, Manpower Histogram, Cash Flows, etc.

Civil Planner, Penta-Shimizu-Toa Joint Venture, Port development

START Date
END Date
Experience Hours (Planning & Scheduling)
2400

Assigned project planner in Acesss road section consisting of the road, drainage system, electrical lines, telephone lines and reclamation works. the project Port Develeopment Project under Japanese consortium.

Junior Site Engineer, MOTA-ENGIL, A41 - Porto Area - Highway enlargement - 15 Km

N
Nuno Silva 👤 Member for 7 years 11 months
START Date
END Date
Experience Hours (Cost Management)
1000

Development of sequential drawings indicating the works on each area and their duration, to proceed to the next phase.

Assistance on Site Management and Cost Control