Progress Reporting

Senior Planning Engineer, ACC Arabian Construction Company, Lebanon Water Front City

W
WAEL ELHAJJ 👤 Member for 18 years 5 months
START Date
END Date
Experience Hours (Planning & Scheduling)
1350
Experience Hours (Cost Management)
1350
Experience Hours (Forensic Analysis)
1350

Set of eleven towers located in Dbayeh marina area , consisting of high quality standard residential towers. Considered to be the largest construction project in Lebanon LWFC has a contract value of 205 million dollars. Project Baseline fully developed and up dated on P6 8.3

Senior Planning Engineer, ACC Arabian Construction Company, Lebanon Water Front City

W
WAEL ELHAJJ 👤 Member for 18 years 5 months
START Date
END Date
Experience Hours (Planning & Scheduling)
1350
Experience Hours (Cost Management)
1350
Experience Hours (Forensic Analysis)
1350

Set of eleven towers located in Dbayeh marina area , consisting of high quality standard residential towers. Considered to be the largest construction project in Lebanon LWFC has a contract value of 205 million dollars. Project Baseline fully developed and up dated on P6 8.3

PLANNING ENGINEER, AMEC Capital Projects (Downstream Oil & Gas), BP CATS Valve Upgrade Project, Bathgate Gas Compressor Station New Works, Kings Lynn Gas Compressor Station Upgrade Project

START Date
END Date
Experience Hours (Planning & Scheduling)
6350
Experience Hours (Cost Management)
500

During my time at AMEC I worked at both the Darlington office and various sites, on live contracts, tenders and FEED studies, using both Primavera P3 and Suretrak computer systems, with supporting documentation produced using various Microsoft packages in-line with the company’s CTR system. In this time I have worked on design, construction, EPC projects and shutdowns.

PLANNING ENGINEER, Whessoe Oil & Gas, Adriatic LNG Terminal, EBIC Ammonia Plant Project, Panipat Ethylene & Propylene Plant Project

START Date
END Date
Experience Hours (Planning & Scheduling)
4700

Working at the head office in Darlington on both live contracts, tenders and FEED studies, using both Primavera P3 and P5 (P3e) computer systems, with supporting documentation produced using various Microsoft packages in-line with the company’s CTR system. In this time I have worked on design, construction and EPC projects. Responsible for programme setup / development, progress monitoring and reporting.

Planner, Project Management Dept- Construction Corp No 1., The Expansion of Thu Duc III Water Plant

START Date

WORK EXPERIENCE (https://www.linkedin.com/in/docongnguyen)

08/2015- now                                 Bidding Officer               

Project Management Dept.1 (PMD1)- Construction Corp No. 1 (CC1)

Planner & Cost Controller, TATA POWER CO. LTD., 4000 MW Ultra Mega Power Project by TATA POWER, India

START Date
END Date
Experience Hours (Planning & Scheduling)
1900
Experience Hours (Cost Management)
50
Experience Hours (Forensic Analysis)
950

The job responsibilities include:

Cost Engineer, Chevron Pacific Indonesia, Oil and gas pipelines, power transmission and distribution infrastructure, Integrated power system improvement reliability, Tank repair services for heavy oil operation, On-shore Pipeline Replacement, Upgrading Fa

START Date
Experience Hours (Cost Management)
950

- Develop business plan cycle for 3 years look ahead

- Capital project management portfolio monitoring

- Capital project management schedule predictability monitoring

- Quarterly Report to Management Steering Commitee

- Project control for major capital project

- Facilitator Cost and Schedule Risk Assessment for small capital project

Cost Engineer, Chevron Pacific Indonesia, Oil and gas pipelines, power transmission and distribution infrastructure, Integrated power system improvement reliability, Tank repair services for heavy oil operation, On-shore Pipeline Replacement, Upgrading Fa

START Date
Experience Hours (Cost Management)
950

- Develop business plan cycle for 3 years look ahead

- Capital project management portfolio monitoring

- Capital project management schedule predictability monitoring

- Quarterly Report to Management Steering Commitee

- Project control for major capital project

- Facilitator Cost and Schedule Risk Assessment for small capital project