Progress Reporting; Critical Path Analysis; Short Term Lookaheads

Planning Engineer, NG Bailey, Watermark Place

START Date
END Date

A large office new-build on the north bank of the Thames in London, Matthew’s role was to assist the Senior Planning Engineer in the day-to-day management of the M&E programme. Using Asta Powerproject, Matthew’s duties would include marking up installation drawings, updating and inputting progress into Asta Powerproject, analysing critical paths and producing short-term lookaheads along with the Engineering team.