Progress Measurement

Planning Manager, Halcrow, High Speed 1

P
Phil Butler 👤 Member for 20 years 9 months
START Date
END Date
Experience Hours (Planning & Scheduling)
9500
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
1000

Responsible for planning and interface management across a variety of contracts from bridges and tunnelling to stations, trackwork and railway systems

Project Controls Lead, DOW Chemical, Stade Polycarbonate / Schkopau EDC/VCM

G
Guy Gaines 👤 Member for 24 years 10 months
START Date
END Date
Experience Hours (Planning & Scheduling)
3500
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
1000

Develop and monitor the detailed plan for execution of a modularly constructed chemical plant in Schkopau, Germany. Monitor and analyze progress, informing the Project Team of potential issues and offering methods for resolution.

Project Planner, AYESA, project Planner at Pacific E&P - oil & gas

L
luis MOya 👤 Member for 10 years 11 months
START Date
Experience Hours (Planning & Scheduling)
300
Experience Hours (Cost Management)
150
Experience Hours (Forensic Analysis)
100

Duties:

Projects planning

·         Ensure the application of Integrated Planning processes for assigned projectsde los procesos de planificación integrada de proyectos.

·         Support Project Team in the analysis of the scope of work , definition of the Work Breakdown Structure, implementing and optimizing project execution plans

Senior Engineering Technician, Sierra Technologies, Rancho Seco Nuclear Generating Station

G
Guy Gaines 👤 Member for 24 years 10 months
START Date
END Date
Experience Hours (Planning & Scheduling)
500
Experience Hours (Cost Management)
0
Experience Hours (Forensic Analysis)
500

At the Rancho Seco Nuclear Generation Station, Sacramento, California; Coordinated input from over 50 engineers in an enormous technical review, in the course to successfully restore NRC licensing to the facility.  Developed database uploads/downloads from P2 VAX based schedule processor.  Developed “punchlist” database to assist in task management; Debugged test procedure reviews, streamlining and reducing review/approval cycle times.

Integrated Planner & Master Schedule, Ansaldo STS, Linea 2 Metro Lima

START Date
Experience Hours (Planning & Scheduling)
14000
Experience Hours (Cost Management)
9500
Experience Hours (Forensic Analysis)
2500

Head of Planning & Cost Control Department

Develop of EPC Master Schedule

Update execution schedule level 3 and 4.

Cost Control (labor and equipment)

Measure Productivity Index (Labor)

Progress Measurement (Engineering, Procurement, Construction and Commissioning)

Curve S Development

Develop Monthly Reports 

PLANNING ENGINEER, Whessoe LGA Gas Technology, Dabhol LNG Project, Depa LNG Tankage Project, Kotri Barrage Rehabilitation Project, Hammerfest LNG Project

START Date
END Date
Experience Hours (Planning & Scheduling)
6500
Experience Hours (Cost Management)
500

During my time at Whessoe, I was employed at the head office on both live contracts and tenders, using Primavera P3, Suretrak & Microsoft Project 98 computer systems, with supporting documentation produced using various Microsoft packages. In this time I have worked on design only projects, EPC projects, tenders and FEED studies.

PLANNING ENGINEER, AMEC Capital Projects (Downstream Oil & Gas), BP CATS Valve Upgrade Project, Bathgate Gas Compressor Station New Works, Kings Lynn Gas Compressor Station Upgrade Project

START Date
END Date
Experience Hours (Planning & Scheduling)
6350
Experience Hours (Cost Management)
500

During my time at AMEC I worked at both the Darlington office and various sites, on live contracts, tenders and FEED studies, using both Primavera P3 and Suretrak computer systems, with supporting documentation produced using various Microsoft packages in-line with the company’s CTR system. In this time I have worked on design, construction, EPC projects and shutdowns.

Planning Engineer / Project Control Engineer, Toyo Engineering, DPC Demo Plant Fabrication [ EPCm ], ECC Debottlenecking & Flare Revamp Works [ EPCm ]

START Date
Experience Hours (Planning & Scheduling)
6000
Experience Hours (Forensic Analysis)
4000

Turn Around Scheduler/Construction Planning Engineer                                                                June 2013 – present

Ethylene Cracking Complex Debottlenecking & Flare Revamp Project

Mine Surveyor and Planner, Ironton Mining (pvt) Ltd, Zimbabwe, Numerous

START Date
END Date

Developing a solid foundation of skills through comprehensive training as a Mine Surveyor and Planner

Gaining exposure to mine planning and design, development of project organisation and production progress measurement

Responsible for training three assistants and for coordinating meetings with managers and team leaders

Utilising strong planning and organisation skills to create reports and schedules, for direct use in problem resolution