Design Schedule Lead, Jacobs Engineering, Ohio River Bridges Downtown Crossing
Finalized, adapted and maintained a 4,500+ activity P6 CPM design schedule for the OhioRiver Bridges Downtown Crossing Project. Project includes a cable-stayed bridge; 100 otherbridges; a roadway re-design across two states; Intelligent Traffic System (ITS) design, aesthetictreatments; as well as geotechnical explorations and reports.