Primavera Planning & Scheduling

Senior Planning Engineer, NCOC (Total), Kalamkas Sea Project

START Date

Roles / Responsibilities / Achievements:

 

  • Support Kalamkas Sea Concept Select Phase activities
  • Consolidate input from studies for application in various schedules
  • Prepare Option and Selected Concept schedules
  • Ensure consistency with the integrated schedule prepared by the Planning Directorate

Senior Planning Engineer, Cameron, Various Subsea Deepwater Development Projects

START Date
END Date

Roles / Responsibilities / Achievements:

 

  • Adapted and developed preliminary work breakdown structures (WBS) to suit the specific job scope
  • Played a key role in the development and maintenance of Pre-tender and Tender schedules for new projects
  • Development and Maintenance as well as Level 3-5 schedules for Engineering, Equipment manufacturing / fabrication, Testing and Installation.
  • Preparation of Resource Loaded schedules and generation of S-curves and histograms etc
  • Factory

COST ESTIMATE PREPARATION PER API 5CT, VALLOUREC, TENARIS SPECS, "Mannai Coorparation, Doha, Qatar", MANUFACTURING CROSSOVER, FLANGE

START Date

COST ESTIMATE PREPARATION FOR OIL & GAS INDUSTRY, USING API 5CT, VALLOUREC & MANNESMANN, TENARIS, HUNTING JFE BEAR SPECS. (MANUFACTURING AND FABRICATION.)  

COST ESTIMATE PREPARATION PER API 5CT, VALLOUREC, TENARIS SPECS, "Mannai Coorparation, Doha, Qatar", MANUFACTURING CROSSOVER, FLANGE

START Date

COST ESTIMATE PREPARATION FOR OIL & GAS INDUSTRY, USING API 5CT, VALLOUREC & MANNESMANN, TENARIS, HUNTING JFE BEAR SPECS. (MANUFACTURING AND FABRICATION.)