Primavera P3

Delay Analyst (MEP), ATAL Engineering, Ngau Tam Mei Water Treatment Works

A
Alan Leslie 👤 Member for 24 years 1 month
START Date
END Date
Experience Hours (Forensic Analysis)
750

Delay Analyst - Sourcing contemporaneous records and providing delay analysis in support of EoT and delay and disruption claims at Ngau Tam Mei Water Treatment Works. 

Senior Planning Engineer, Systech International, Taiwan High Speed Rail Project

A
Alan Leslie 👤 Member for 24 years 1 month
START Date
END Date
Experience Hours (Planning & Scheduling)
500

Senior Planning Engineer - Senior Planning Engineer. Seconded to TST Joint Venture to assess and develop planning support requirement for Taiwan High Speed Rail.

Planning Engineer, Siemans, GREAT MAN MADE RIVER PROJECT

A
Alan Leslie 👤 Member for 24 years 1 month
START Date
END Date
Experience Hours (Planning & Scheduling)
2750

Development of schedules for design and installation of the SCADA remote operating systems for Great Man Made River Phase 2 (the pumping of fresh water from an underground lake through 1,000km of 5m diameter Water Pipe and Pumping Stations between south Libya and Tripoli).

Project Planning and Control, Non-Ferrous Mines & Metals Co. , Copper Mine, Copper complex EPC project

START Date
END Date
Experience Hours (Planning & Scheduling)
3800
Experience Hours (Cost Management)
800
Experience Hours (Forensic Analysis)
300
  • Conceptualized and launched processes and set of tools for capturing project metrics and funneling that information to easy-to understand reports. Enabled executive management to keep a pulse on project health, revenue expectations, and strategic analysis of projects.
  • Managed project of a fully in house developed PMIS (Project Management Information System) built on a .Net + SQL platform in integration with MS Project 2003, Excel and VBA macros.

Project Planner, Redis Construction Afrika (Pty)Ltd, Nickel Tank House Rustenberg

START Date
END Date
Experience Hours (Planning & Scheduling)
1100

Project Planner, Redis Construction Afrika (PTY) Ltd

In this role I was a Project Planneron Multi Discipline project where i worked on Primavera P3, Resource Loading  was done by myself as well as the Supervisors. I worked closely with Material Control as to see what stock had been brought to site and what else was needed to order to complete the Project.

Project Planning Coordinator, SMS Demag Ltda., Steel making projects: bloom and beam blank continuous casting machine, steel plant and steel process plants.

START Date
END Date
Experience Hours (Planning & Scheduling)
14800
Experience Hours (Forensic Analysis)
5150

Planning management to install the CSN-PR plant during 4 years, working as user with the software Primavera including the schedule development and its control, and the Converter 3 plant to CST during 3 years. Both projects were turnkey contracts, comprising from engineering to commissioning phase. The project language was English and the participation started on the late negotiation phase. Support to preparation and defense of claims associated to both projects. Commissioning planning of the bloom continuous casting machine to Açominas.

Senior Planning Coordinator, Siemens VAI Metals Technologies Ltda., Steel Making Projects: slab continuous casting machine and 2 steel plants

START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Forensic Analysis)
650

Planning management of turnkey contract to modernization of the slab continuous casting machine 3 to COSIPA. Installation planning of 2 steel plants to Companhia Siderúrgica do Atlântico-CSA.

05.2008 – 06.2008           installation planning of 2 steel plans to ThyssenKrupp in Companhia Siderúrgica do Atlântico-CSA in Rio de Janeiro-RJ.