Primavera

Primavera

Principle Planning Engineer, Network Rail Ltd, West Coast Mainline Upgrades

START Date
END Date

Lead Planner for Crewe to Glasgow Project Group with two direct reports.  Responsible for overseeing the preparation of Level 3 Critical Path Networks and Bar Charts integrating separate multi-disciplinary railway design and construction programmes, preparation of Earned Value analysis and updating of Network Rail reporting systems (PMCS and PCS).

Senior Engineer, GTP, Various

START Date
END Date

Formulating detailed cost estimate for piping and equipment disciplines.

Sharer in work estimate.

P3 Schedule preparation, based on engineering, materials delivery and procurement schedule Preparation documents: Schedule development, Schedule resource loading & Leveling andwork progress control :

- Gas storage tank (sphere : 2000 m3)

- Replace an existing pipeline (9,2 km of 10”,12”, 16” and 20”)

- Enhanced oil recovery in R / Baguel,

Senior Planning & Project Controls Engineer, Consolidated Contractors Company CCC / McConnell Dowell (JV), Baku - Tbilisi - Ceyhan Crude Oil Export Pipeline (BTC) Project, Baku, Azerbaijan. The Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline is to export

START Date
END Date

Duties included preparing Front End Load (FEL) documents in order to mobilise and start work in Pipe Yards and Camps; initiating method statements, risk assessments, and scope and schedule of works; managing CPM Schedule of works for pipe dump yards and camps.

Assistant Planning Engineer, Chicago Bridge and Iron (CB&I), Trans Thai Malaysia Gas Receiving Terminal

M
Mark Smith 👤 Member for 20 years 6 months
START Date
END Date

Creating a master access database for recording the progress of piping and associated activities.

  • Daily progress recording and reporting along with liaison between the office and site supervision.
  • Monitoring material deliveries and sub-contractor fabrication and progress.
  • Establishing and ensuring prioritized activities are being worked on to maximise productivity.
  • Obtaining clients’ signatures for monthly progress completed.

Lead Project Planner, Bombardier, GoVia/BCV/SSL

M
Mark Ambler 👤 Member for 15 years 10 months
START Date
END Date

Creation of P3 plans to support build, test and commissioning projects utilising resource, cost and earned value techniques,

Production of overall integrated P3 plans for the project to ensure optimum project completion, KPI and milestone achievement.

Senior Planner, Arlant, MegaPTA Plant

M
Mark Ambler 👤 Member for 15 years 10 months
START Date

Commissioning of a PTA plant (750KTe/year) in Portugal.

Lead Planning role to develop all programmes and tracking information for the project. Creation of KPIs, Graphs and spreadsheets to monitor and report progress and resource requirements.

Organisation and running of planning meetings with Management, Operations Teams, Sub-contractors and Vendors.

Reviews of logic, durations and critical path to assess programme achievability and steps to mitigate shortfalls.

Senior Planner, Arlant, MegaPTA Plant

M
Mark Ambler 👤 Member for 15 years 10 months
START Date

Commissioning of a PTA plant (750KTe/year) in Portugal.

Lead Planning role to develop all programmes and tracking information for the project. Creation of KPIs, Graphs and spreadsheets to monitor and report progress and resource requirements.

Organisation and running of planning meetings with Management, Operations Teams, Sub-contractors and Vendors.

Reviews of logic, durations and critical path to assess programme achievability and steps to mitigate shortfalls.

Project Planner, Hatch Africa, Transnet Saldanha Port Upgrade Phase 1 Execution, Phase 2 Feasability Study and Dust Mitigation Projects

C
Cobus Swart 👤 Member for 14 years 6 months
START Date
END Date

Developing, resourcing, updating and Baselining of project schedules, Monthly and Bi-Monthly Project, Engineering, Procurement, Fabrication, Construction, Commissioning and Close-Out progress reports. Level 4 Engineering planning and progress reporting. Liasing with contractors for weekly progress reports. Change management on schedule and Trend Reports. Forecasting Project Cashflows with Cost Engineers. Tender Programme Adjudication in conjunction with Contract (NEC) requirements. Evaluate Contractor Programmes for time and cost implications before acceptance.