)Planning

Claims Analysis Planner, AMEC, Longannet Power Station - FGD

E
Eden Day 👤 Member for 15 years 9 months
START Date
END Date

I spent four months assisting on a claim for the project. This included the production of a P3 programme which visualised the historical data collected in the analysis of many drawings, documents and the contract. Utilising my extensive knowledge of Earned Value allowed me to clearly analyse data and S-curve’s, ensuring I was fully prepared for discussions with the project manager and confident presenting to the client. I also often progressed the program actuals using P5 and updated the expended man hours on a weekly basis.

Project Controller, AMEC, Longannet Power Station - FGD

E
Eden Day 👤 Member for 15 years 9 months
START Date
END Date

Managing the production of a Level 5 commissioning programme to be integrated into the master delivery programmes, working as Project Controller at the Longannet Power Station, Scotland. Constant communication with the Commissioning Manager as well as daily meetings with the project team allow me to be kept up to date of current progress and able drive the planning teams within the joint venture to implement the solution both accurately and correctly. I also frequently interface with the client in a formal setting.

SENIOR PLANNER, Foster Wheeler, REFINERY, OIL-GAS SEPARATION PLANT , GAS TURBINE POWER PLANT

START Date
END Date
  • Planning and scheduling projects .
  • Assigning resources, cost data and define relationship to activities Producing.
  • Development Procurement  schedules.
  • Maintenance project master schedules and detailed schedules, resources and costs.
  • Identify all critical paths within a project by using float path analysis.
  • Interface project schedules ,control, monitoring and technical support
  • Create graphics including gantt charts, activity network diagrams, timescale logic Diagrams and histograms.
  • Control budgets, changes and

SENIOR PLANNER, Foster Wheeler, REFINERY, OIL-GAS SEPARATION PLANT , GAS TURBINE POWER PLANT

START Date
END Date
  • Planning and scheduling projects .
  • Assigning resources, cost data and define relationship to activities Producing.
  • Development Procurement  schedules.
  • Maintenance project master schedules and detailed schedules, resources and costs.
  • Identify all critical paths within a project by using float path analysis.
  • Interface project schedules ,control, monitoring and technical support
  • Create graphics including gantt charts, activity network diagrams, timescale logic Diagrams and histograms.
  • Control budgets, changes and

Sr.Planning Engineer / Site Contract Administrator, SIEMENS EGYPT I & S, HSBC Cairo Regional Processing Center at Smart Village-Egypt

A
Ahmad zaozu 👤 Member for 18 years 9 months
START Date
END Date

·   Provide the project time Schedule.

·   Monitor and control the performance against the time schedule.

·   Issue progress, Status reports, weekly and monthly reports.

·   Direct and share management for Progress meetings.

·   Monitor& control the changes against the baseline.

·   Recommend Corrective actions and preventive actions.