Assistant Engineer - Planning & Project Control, Essar projects india ltd., Fabrication
Preparation of project scjedule.
Find out Raw material requirement.
Controlling of projetc.
Preparation of project scjedule.
Find out Raw material requirement.
Controlling of projetc.
I have gained vast experience during my career working initially as an Electrician, then moving on to different positions as Electrical Commissioning Technician, Project Technical Support Officer and finally Project Planning Engineer
<?xml:namespace prefix = o />
I
ITA – Missionwith TECHNIP (Sub sea Branch) for BURULLUS
« Planning Manager for a project of sub sea installation in Egypt »
Tasks:
Planning Manager:
ECP – Missionwith FOSTER WHEELER for TOTAL PETROCHEMICALS (76)
« Preparation and following of the construction phase of a petrochemical unit modernization project (Styrene) »
Tasks:
Planning Manager:
TECHNIP FRANCE – INDUSTRIES Branch.
« Write of a guidebook of Construction Management based on the construction project of pharmaceutical active substances production unit for ORIL Industrie –SERVIER group (France - 76). »
Tasks:
Writing of the guidebook developing 5 themes: Detailed studies, Schedule, Quality, Extra works management and Documentation.
Assistant of Project Engineer
Project: (SARAS, Sarroch, Italy)
SARAS T.A. FCC 2009
From October 2008 until July 2009 I was involved in the planning of the FCC and Alkylation plants stop, together with the schedule of investments for all disciplines (civil - mechanical - electrical instrumentation). After realizing three of the five level 4 subprojects, I coordinated four scheduler that every day were uploading advances in the same schedule.
I supervised of the plant stop master, a program containing 13,000 task and its resources.
Project: (Technip - Irem, Rotterdam, Netherlands)
NESTE OIL - NExBTL renewable diesel plant Rotterdam
From July 2009 until December 2010 planner manager at the site of Neste Oil Rotterdam with IREM Spa on behalf of Technip Italy.
Project: (Tecnicas Reunidas - Irem, Athens, Greece)
HELLENIC PETROLEUM S.A. - Elefsis Refinery Upgrade Project
From March 2011 planner&scheduler&progress reporter at the site with IREM Spa on behalf of Tecnicas Reunidas.
Main Tasks: preparing the schedule level of detail 4 of the mechanical construction (Piping, Equipment, Structure erection and Precommissioning) on Primavera P6. Creation of special tools in Access, Excel to load the weekly progress.
183 Room Hotel & 38 Apartments (total value £6.5m)
My Duties included:
Two School Extensions, and one New Build (total value £8.5m)
My Duties included: