)Planning

Lead planner / Planning Manager, ITA for TECHNIP France (BURULLUS subsea Project), Structures, Subsea installation of Rigid, Umbilicals and Flexibles in Egypt

START Date
END Date

ITA – Missionwith TECHNIP (Sub sea Branch) for BURULLUS 

 « Planning Manager for a project of sub sea installation in Egypt »                               

Tasks:       

Planning Manager:

Lead planner / Planning Manager / Deputy Construction Manager, ECP for FOSTER WHEELER France (TOTAL Petrochemicals Project), petrochemical unit modernization project (Styrene)

START Date
END Date

ECP – Missionwith FOSTER WHEELER for TOTAL PETROCHEMICALS (76)

« Preparation and following of the construction phase of a petrochemical unit modernization project (Styrene) »

Tasks:       

Planning Manager:

  • Coordination and managing of Scheduling Team (4 people total)
  • Realization and monitoring of construction planning (Primavera P3)
  • Setting-up o

Project Assistant, TECHNIP France - Industry Branch for SERVIER Group - ORIL Industry, guidebook of Construction Management based on the construction project of pharmaceutical active substances production unit

START Date
END Date

TECHNIP FRANCE – INDUSTRIES Branch.

« Write of a guidebook of Construction Management based on the construction project of pharmaceutical active substances production unit for ORIL Industrie –SERVIER group (France - 76). »

Tasks:       

Writing of the guidebook developing 5 themes: Detailed studies, Schedule, Quality, Extra works management and Documentation.

Assistant of Project Engineer

Planner Manager, SARAS, SARAS T.A. FCC 2009 - Cagliari - Italy

F
Fabio Calvo 👤 Member for 15 years 3 months
START Date
END Date

Project: (SARAS, Sarroch, Italy)

SARAS  T.A. FCC 2009

From October 2008 until July 2009 I was involved in the planning of the FCC and Alkylation plants stop, together with the schedule of investments for all disciplines (civil - mechanical - electrical instrumentation). After realizing three of the five level 4 subprojects, I coordinated four scheduler that every day were uploading advances in the same schedule.

I supervised of the plant stop master, a program containing 13,000 task and its resources.

Planning Manager, IREM S.P.A. - Italy, NESTE OIL - NExBTL renewable diesel plant Rotterdam - Holland

F
Fabio Calvo 👤 Member for 15 years 3 months
START Date
END Date

Project: (Technip - Irem, Rotterdam, Netherlands)

NESTE OIL - NExBTL renewable diesel plant Rotterdam

From July 2009 until December 2010 planner manager at the site of Neste Oil Rotterdam with IREM Spa on behalf of Technip Italy.

Planner Manager, IREM S.P.A - Italy, HELLENIC PETROLEUM S.A. - Elefsis Refinery Upgrade Project - Athens - Greece

F
Fabio Calvo 👤 Member for 15 years 3 months
START Date

Project: (Tecnicas Reunidas - Irem, Athens, Greece)

HELLENIC PETROLEUM S.A. - Elefsis Refinery Upgrade Project

From March 2011 planner&scheduler&progress reporter at the site with IREM Spa on behalf of Tecnicas Reunidas.

Main Tasks: preparing the schedule level of detail 4 of the mechanical construction (Piping, Equipment, Structure erection and Precommissioning) on Primavera P6. Creation of special tools in Access, Excel to load the weekly progress.

CONSTRUCTION/PLANNING ENGINEER, NG Bailey, Harrow Schools

START Date
END Date

Two School Extensions, and one New Build (total value £8.5m)



My Duties included:

  • Creating Master Programmes (Pre-commencement, Design & Drawing Production, Procurement, Construction, Commissioning & Handover) - Using Asta Powerproject
  • Creating Short Term Programmes
  • Fortnightly Progress Reporting
  • Regular Delay Analysis Reports