Sr. Industrial Engineer , Poona Divisional Productivity Council, Designing Incentive Scheme at Alpha Laval Ltd., Job Evaluation for INA bearings Ltd.

A
Atul Phadke 👤 Member for 13 years 8 months
START Date
END Date

 

Ø  Responsibilities:

1.       Performing Business Improvement projects

2.       Project Scheduling and tracking using MS Project 2007.

3.       Conducting Job Evaluations and 5S audits.

4.       Provide Primavera P6 and MS Project 2007 training.

Sr. Industrial Engineer , Poona Divisional Productivity Council, Designing Incentive Scheme at Alpha Laval Ltd., Job Evaluation for INA bearings Ltd.

A
Atul Phadke 👤 Member for 13 years 8 months
START Date
END Date

 

Ø  Responsibilities:

1.       Performing Business Improvement projects

2.       Project Scheduling and tracking using MS Project 2007.

3.       Conducting Job Evaluations and 5S audits.

4.       Provide Primavera P6 and MS Project 2007 training.

Planner, Alcon Nigria Limited, AKWA-IBOM INTERNATIONAL AIRPORT OYO, GREATER PORT HARCOURT CITY DEVP. BULK SEWER AND PUMP STATIONS

START Date

• Ensuring that established planning and scheduling methodology is followed in order to develop a workable schedule.

• Developed project schedule which shows hierarchical work breakdown structure using Primavera (P6).

• Maintain project work breakdown structure (WBS).

• Reviewing and updating project schedule.

• Analyzed and added resources and roles to activities on the project schedule

Project Control Manager, Cosapi S.A., Sewage Treatment Plant

START Date
END Date
Experience Hours (Cost Management)
1500

 

- Setting and Monitoring Schedules and Cost Baselines

- Reforecast Budget at Completion

- Preparation of Cash Flow

- Elaboration of Reports to the Client and the Steering Committee

Other Duties

Project Planner, KDI OIL AND GAS SECONDED TO Agip Nigeria, Laying of 10.5 KM dual string 6” flowline from Ashaka D location to Kwale flow station (seconded to ENI AGIP)

START Date

• Provided planning support to project management team. • Updated the progress of the work and prepare reports on scope and schedule of work done in accordance with cost data. • Produced Earn value analysis to evaluate project performance and predict final results of project to project management team using P6. • Prepared the analysis for work scope comparisons and scheduling criteria between multiple projects using P6. • Generated critical path analysis on all projects and normalised the project schedule. • Compared the logic between the baseline schedule and the current schedule.