Planning & Scheduling

Shutdown Planner, OTS, Foster Wheeler, Brunei LNG, Nigeria LNG, SABIC PMT, LNG Shutdown, EO-EG.SMPO,LOP De-Bottleneck

START Date
END Date

Projects Control Engineer

Sinopec Shanghai Engineering Company (Sole Proprietorship)

Sole Proprietorship; 1001-5000 employees; Mechanical or Industrial Engineering industry

Shutdown Planner, OTS, Foster Wheeler, Brunei LNG, Nigeria LNG, SABIC PMT, LNG Shutdown, EO-EG.SMPO,LOP De-Bottleneck

START Date
END Date

Projects Control Engineer

Sinopec Shanghai Engineering Company (Sole Proprietorship)

Sole Proprietorship; 1001-5000 employees; Mechanical or Industrial Engineering industry

Contol & Monitoring, Senior Planning, Gulf Engineering and Industrial Consultancy, Industrial structure, National Highway & Bridges

START Date
END Date
Experience Hours (Planning & Scheduling)
1000
Experience Hours (Cost Management)
250

  

From  April 2009 to till date        Gulf Engineering and Industrial Consultancy

Senior Planning Engineer, NAKHEEL, PJSC – WATERFRONT , Infrastructure- Canal & Canal’s Bridges

START Date
END Date

 

 

Main  responsibilities  included  to liaison with client, consultant, consortium members and contractors on issues related to Time Schedule, CashFlow Curve ,EPS ,WBS etc

Senior Planning Engineer, NAKHEEL, PJSC – WATERFRONT , Infrastructure- Canal & Canal’s Bridges

START Date
END Date

 

 

Main  responsibilities  included  to liaison with client, consultant, consortium members and contractors on issues related to Time Schedule, CashFlow Curve ,EPS ,WBS etc

Consortium Planning Manager, SINO Group, Olympian City 1 & 2 Development

START Date
END Date

Overall in-charge of the PROJECT PLANNING/SCHEDULING & CONTROL of the three(3) simultaneous large scale Airport Core Development projects, "OLYMPIAN CITY 1 & 2" in Tai Kok Tsui, HK, which include:

PLANNING MANAGER, China State Construction Engineering Corporation (CSCEC), MTR & KCRC Railway Projects, Site Development, Disneyland Project

START Date
END Date

1. JORDAN VALLEY SITE DEVELOPMENT Project in Hong Kong. It compasses a 1 Million cu.m. Rock Blasting/Excavation and built the longest Rock Conveyor, new roads and subway tunnels.



2. KCRC SOUTERN LINK RAILWAY TUNNEL (KDB300 & 200). More than 2 km floating railway tunnel construction using open-cut excavation, massive diaphragm, bored piles, secant walls, temporary sheet pile cofferdams, ground freezing, sophisticated ground investigation and instrumentations. In-charge of the tendering package and the project construction baseline.